IDC system facility maintenance
IDC maintenance
IDC maintenance item
Power system
Contents:
-
Voltage & current measurement
-
Loop test
-
Impedance test
-
Insulation test, thermal image development test
Purpose:
-
Prevent from abnormal voltage and current to facilitate keeping normal operation of the equipment
-
Check the circuit for any abnormal breakage to facilitate normal operation of the equipment
-
Check the circuit for aging which causes poor or abnormal conductivity to facilitate normal operation of the equipment
-
Check the circuit for any damage, abnormal leaking to facilitate normal operation of the equipment
Air-con system
Contents:
-
Air-con distribution panel measurement
-
Chiller host unit test
-
Water pump test
-
Air-con box maintenance
-
Water tower cleaning
Purpose:
-
Check the air-con power system for any abnormality to facilitate normal operation of the equipment
-
Check that the chiller host unit system is normal to facilitate normal operation of the equipment
-
Reduce energy consumption and prevent from abnormality to facilitate normal operation of the equipment
-
Cleaning service and check that the water tower operates properly to facilitate normal operation of the equipment
Security system
Contents:
-
Card reader inspection and cleaning
-
Reed switch test
Purpose:
-
Check that the card reader operates properly to facilitate normal operation of the equipment
-
Check the reed switch for any abnormality to facilitate normal operation of the equipment
Fire-fighting system
Contents:
-
Host unit AC/DC power measurement
-
Host unit signaling function test
-
Alarm signaling and interlinking test
-
Detecting sensor test
-
Fire extinguisher cylinder pressure test
Purpose:
-
Confirm that all actions are normal
-
When there is a fire, it can immediately extinguish it.
-
When an accidental fire occurs, it can ensure normal operation of the fire-fighting equipment to reduce personal injury & death and property damage.
UPS
Contents:
-
Electric voltage and current measurement
-
Battery internal resistance inspection
-
System charging test
-
Battery measurement and cleaning
Purpose:
Measure that the power of UPS is normal to facilitate normal operation of the equipment.
Prevent the battery from aging and change it earliest possible to facilitate normal operation of the equipment.
Test the battery performance to facilitate normal operation of the equipment.
Generator system
Contents:
-
Engine oil, radiator, belt inspection
-
No loading & loading test
Purpose:
-
Prevent the machine from aging, deteriorating to facilitate normal operation of the equipment.
-
Generator performance test to facilitate maintenance for normal operation of the equipment.
Environment control system
Contents:
-
Comparison of the environment control power readings and the measured values.
-
Confirm that the environment control detecting values are normal.
-
Texting machine and modem dial number properly
-
Calibrating temperature and humidity
Purpose:
-
Let customer clearly understand the status of each system to well control the current condition of the equipment. In the event that the equipment fails, it can be handled or responded quickly.
Contents:
-
Liquid leaking system function test
Purpose:
-
Prevent from being unnoticed when water leaks, causing loss and damage.
Water leaking detection system
Contents:
-
VESDA system host unit inspection
-
VESDA system host unit signaling
-
Detector function
-
Host unit alarm and interlink signaling test
-
VESDA smoke curve reading
Purpose:
-
Prevent from being unnoticed when water leaks, causing loss and damage.
Very early stage alarm system
Contents:
-
Infrared telemetry thermal image analysis system
Purpose:
-
Under the UPS environment, perform on-line test
-
Power transmission and distribution system, machine rotating system, heating & cooling system, buildings, etc with a wide range of application.
-
Non-contact type, quick temperature measurement, agile reaction, non-destructive, pre-check and early detection.
Infrared thermal image test